These Sid Martin Biotech Incubator facility specs are useful to our client companies when arranging comprehensisve general liability insurance.
Year built -- 1995
40,000 Sq Ft, monitored 24/7 by University of Florida
No prior losses
Type of construction; roof construction wall construction - floors are concrete with tile; walls are engineered metal with insulated siding (composite metal); roof is steel with foam insulation and roll fiberglass asphalt roofing; there is steel support throughout the building; inside walls are sheetrock.
Number of stories - two but space is only rented on first floor. Second floor is for air handlers.
Sprinkler system
Swipe card after-hours access.
Negative pressure “wet” labs with 12’ ceilings
Chemical fume hood in all labs, certified annually
Biosafety cabinets in all labs, certified annually
Small labs approx. 500 Sq Ft, large approx. 1000 SF
Office space available
Single-pass air in lab areas with 12x per hour air exchange
110v to 480v 3-phase electrical service
270 kW generator backup for dedicated circuits
In-house air, vacuum, gas to all labs
In-house DI water to all labs, monitored daily
Ultrapure water in central location
Autoclaves (3) – installed wall unit, floor model, bench top
Radiation work accommodated
Quarterly preventive maintenance for air handlers
Two loading docks